Friday, 11 July 2014

Number one son and I had a walk around the estate last weekend – there was beauty to behold.


 
 
 
 
 
 
 

Humidity ‘aint so bad when it shows itself as gorgeous fog over the lake.


 
 
 
 
 
 
 
 
 
 
And water droplets on a grass tree.
J

 

Thursday, 10 July 2014

Sooooo – our floors could get laid over the top of that weird waterproofing membraney stuff:



 
 
 
 
 
 
  

But it was obviously better to get some waterproofing layer that did the job properly (you can see the nice shiny smoothness in the background):


 
 
 
 
 
 
 
 
Sooooo - 4 and a half rooms all lovely wood floors to look at and love J in the first week.  Half a room…mmm, the jarrah floorboards we picked up (from the Salvage yard even though they are brand new – seconds, that is) had some character and we knew we would be lucky to get away with the tight square metreage amount that was available.  We took all the 72m2 available at the salvage yard - for the 68 m2 flooring we needed – so only 4m2 to ‘play with’ and we ended up about 5m2 short now.  We were so lucky to find enough locally to finish off, and Michael got to install them too (I helped a little, it was hard work!)
Soooooo – 39mm of rain one night last week – plenty to water in the septic tanks and leach drains - again – but dang, one of the septic tanks developed a lean – so it needed to be levelled out. 




 
 
 
 
 
 
 
So much work that doesn’t really seem to be a step forward!  Oh well, there *is* always good isn’t there?  Our lovely neighbour, Terry, leant us his brand new sump pump and Michael was able to rig up the block and tackle on some planks suspended across from the tractor to the far bank, and he managed to get it all straightened back up again, after 3 days of work.... but yay! 
And Michael had already had the leach drain all beautifully levelled too:



 
 
 
 
 
 
 
 
 
 
 And had got onto the pick to take out some more of the clay wall so they could sit in a straight row:


 
 
 
 
 
 
 
 
 
 
 But we still had to call in the big digger – again (this is Jo, our neighbour's, dad):


 
 
 
 
 
 
 

The leach drains were about 1m too short (only because we changed over to the plastic ones and you need 14.7m compared to 12 m for concrete) – we knew we were close – and even though Michael is certainly no stranger to hard, digging work, there was no way he could dig through another metre of mud and rock hard gravel.
Best news though – Kent, the plumber could come back yesterday, so all the plumbing is connected and the shire will do their inspection on Friday morning so we can get this all buried and stop the pits flooding!  We sure will be happy with that!!!

Sooooo – still plenty of rainy days lately and still very high humidity in the house.  The doors were being kept open of course as wood flooring got cut etc – but Desmond has Kenny to help now – so the humidity drops right down to ~55% overnight.

 

 
 
 
 
 
 
 
 
 

I hope that is enough to encourage the lice to live outside instead!!  With a life cycle of 21 days we need to keep the humidity down for about 3 weeks to see if they really are dying off – it’s a lesson in patience for me :-/!  It does look like there are much, much fewer bodies on the tiles over the last couple of days – but I am needing to see zero to believe they are gone!

Sunday, 29 June 2014

Had a lovely conversation with Jeff about the origin of the wood used in our benchtop J. 

The story goes something like this: he collected it over 30 years ago from a demolition in North Beach/Watermans Bay.  The building being demolished was an old ‘guest house’ – a ‘holiday hotel’ where olden day Perth folk used to go when their doctor told them they needed ‘fresh air’ for their ailments.  The guest house was situated on top of Flora Street, overlooking the Indian Ocean to one side and Star Swamp to the other.  These planks of jarrah were the floor joists holding up the second story – they were about 5m long and solid and firm and well-seasoned and dry. 
And we love them of course and feel very privileged to be their new caretakers.  Jeff is quite happy with how they are sitting but warned us that one part of one plank ‘might not behave’ – so I am talking calmly to it to let it know we will take care of it and it doesn’t need to worry.  It is no trouble at all to gently massage it either – it is just stunning to run your hand over this benchtop.

Thursday, 26 June 2014

Two steps forward, three steps back – yep, we are still playing the owner-builder game...

One step forward – this gorgeous kitchen benchtop arrived – Thank you Jeff!!


 
 
 
 
 
 
 
 
 
 
Two steps forward – the pump worked well to get the water out of the plumbing pits, we reckon it cleared quite a few 10,000L of water!

 
Step back – humidity in the house staying up above 60% = bugs not going anywhere fast!


 
 
 
 
 
 
 
 
 
 
Step back – the plumbing pit is filling back up – seepage from the banks and more rain!
Step back – looks like the concrete waterproofing product has reacted with the concrete sealer (it should be nice and smooth from what we understand) – and who knows if our wood floors can be laid over this!  And yes, we did tell the supplier we had concrete sealer down there.


 
 
 
 
 
 
 
 
 
 
There are quite a few What if’s? and If only’s floating around in our heads at the moment L…time to find the positives!
Positive – look again at the gorgeous benchtop – and wait ‘til you run your hand over it!! J

Positive – still breathing – only just – got a cold…
Positive – still learning – could do with a break actually…

Positive – still breathing J
Positive – still learning J

Monday, 23 June 2014

So…our world of building – it’s been another couple of weeks – things have slowly progressed, stress levels as expected (highs and lows) – and the list to completion might almost be in sight – but not quite yet!
Plumbing well progressed – check J.


 
 
 
 
 
Septic tanks well watered in:


 
 
 
 
 
 
 
 
  
 
Yes, we’ve had a drop of rain or two…looks like a great lap pool though!
Architraves – check J. 


 
 
 
 
 
 
 
 

 
Stunning, of course – and made mostly from recycled architraves that we were given from a local house demolition J.  And, I only had a minor heart-start to see all the liquid nails that had to scraped off our newly painted walls – so a bit more filling, sanding and painting is now back on the list.
Oh, my kitchen – she is sitting in there, waiting patiently for her benchtop – and I only made Michael pull it out once (so Ryan could cut out one cupboard, and add two to the end instead) – better I changed my mind on Day 2 than later, eh?  Well I thought so anyway – and it is a much better set up now J.  Quite a lovely compromise for a kitchen that was custom made for a different house, in a different configuration.


 
 
 
 

And for people who know such things – the appliances were just for show – they are now removed so the benchtop – arriving Monday – yay! – can be screwed in place properly.  I am still thinking I will paint those jarrah cupboards – but no time right now, and happy to wait until we see how dark it will look with the jarrah benchtop too.
Now - family, friends – meet Desmond, our new dehumidifier.  He is a trouper, working non-stop with narry a complaint – and already got the humidity down 10% - that’s about 20 litres of water removed in the few days he has been here.  Still need to get down another 10% if we can…



 
 
 
 
 
 
 
 
 

But, good news – the bugs are much less frequent visitors already – yay J.   And as much I do really love bugs, these still gotta go!!
And Saturday’s family bonding time before soccer – assembling the units for our leach drains – we give our kids good, clean entertainment around here!


 
 
 
 
 
 

We chose plastic leach drains this time because they sound more environmentally friendly – made in WA, recycled plastic and 100% recyclable.  And everyone says they do the job right – so not much to not recommend them I hope. 
So, now – we are waiting for the wood floor man – who was supposed to be here a fortnight ago, wouldn’t answer or return our calls last week, until finally he did and said he was too busy to do our job – so we are waiting for the new wood floor man (who’s name, in fairness, was given to us by the first wood floor man).  The new wood floor man has promised us he will be here by the end of this coming week… so, we wait...patiently…and know there is plenty to be getting on with of course - one thing high on the list will be to get a pump so the lap pool goes, and the leach drains go in instead!

Ah, lookie, the garden is coming along:
We planted our rockeries several weeks ago – wee little natives from the Geographe Landcare Nursery – they look like they have settled in well.  Kangaroos only ate a few.



 
 
 
 
 
 
 
 
 
 
 Vege tank beds sprouting green too J.


 
 
 
 
 
 
 
 
I put in a few of most seeds that I had – so you will see corn and sunflowers in the middle there with the peas – yes, I know it is not the right time for them, but I wanted green desperately – and if they do grow tall enough, they will help support the peas – and we might even get a renegade sunflower…
I turned the first compost bolognaise (see it in the background) and made a second pile, and a third and a fourth – I love compost!

And lookie at this little garden friend – oops, I think I frightened him.















And people – we have a baby cauliflower!! 


 
 
 
 
 
 
 
Come, my little flower – grow big – so I can eat you!

Wednesday, 11 June 2014


When I wonder, when I question, when I doubt….


 
 
 
 
 
 
 
 
God gives me the answer - this is why...
Isn’t that a stunning sunrise – no photoshopping either!!

Michael and I are doing quite a bit of wondering, questioning and doubting just lately.  At this late stage of the build we are getting tired, feeling the effects of working hard for the last several months to get our home to this stage and are really feeling ready to just have it finished and done!  We are feeling ready to move in and start a ‘real’ family life again.  We are feeling ready for it to just be us here.
Plus our building permit expiry is looming and it is going to be a close call if the house is completed by then.  The requirement is that the bathroom and kitchen are fully functioning (including a splashback apparently) – and since we haven’t quite got any benchtops organised...well, you get the picture…